Hengam Gas Refinery Offsite Piperack

| Project: | Hengam Gas Refinery Offsite Piperack | 
| Client: | IOOC | 
| Main Contractor: | Jondishapour Co. | 
| Engineering Subcontractor: | Rahbord Energy | 
| Project Location: | Qeshm Island | 
| Capacity: | Inter connecting Piperacks between Oil Production Plant and Hengam Gas Refinery. The Piperacks will transfer all Process, utility & flare lines between two plants. The length of piperack is almost 400meters. | 
| Technical Category: | Interconnecting Piperacks | 
| Services Performed: | Detailed and Procurement Engineering & As-built Drawings | 
| Estimated Man-hour: | 6.000 | 
| Project Status: | Finished | 