Early Production of Band-e-Karkhe Oil Field Project
 
| Project: |  Early Production of Band-e-Karkhe Oil Field Project | 
| Client: | PEDEC Co./ Petro Farayand Karkhe | 
| Main Contractor: | Gordavaran Farashband Co. | 
| Engineering Subcontractor: | Rahbord Energy | 
| Project Location: | Khouzestan / Ahwaz | 
| Capacity: | 15000 BBLs/day Crude oil Production Plant 3 wellhead Facilities 3 flow Lines for Connecting wellheads to Production Plant 60 km Transmission Pipeline Non Industrial building Control & SubstationUtility Systems required for Production Plant | 
| Technical Category: | Oil Production Plants, Oil Wellheads and Underground Pipelines | 
| Services Performed: | Detail and Procurement Engineering & As-built Drawing | 
| Estimated Man-hour: | 40,000 | 
| Project Status: | Finished | 